Track work on live premises almost always means working around the freight flow. We stage the work so the track is closed only for as long as it must be.

SLEEPER PITCH 600 mm 1435 mm
Track structure — ballast prism, sleepers, rails1435 mm gauge, sleeper pitch per design
CH 0+060

What we do

  • Rail formation earthworks: cuttings, embankments, compaction, slope protection.
  • Ballast prism: laying, profiling, lifting and lining of the track.
  • Track laying: sleepers, rails, fastenings and joints.
  • Turnouts: new turnouts installed and existing ones replaced.
  • Level crossings and platforms: surfacing and approach works.
  • Maintenance and repair: geometry correction, ballast cleaning, component replacement.
CH 0+240

Track record

Railway work at the company began with formation earthworks and grew into track laying. The company is a member of Gelpa, the association of Lithuanian railway service companies.

We have worked inside the terminals of the port of Klaipėda — including the reconstruction of railway tracks on the premises of the Klaipėda sea cargo company, and track and platform works on the Plungė section. On the Plungė–Šateikiai section we took part in the second-track programme.

CH 0+420

Technical parameters

Gauge
1435 mm
Track types
Industrial access tracks, sidings, station tracks
Ballast
Crushed stone 31.5/63, prism per design
Sleepers
Concrete and timber
Turnouts
New installation and replacement
Working method
Staged, agreed against the traffic timetable

Have a site? Send us the drawings.

We answer invitations to tender, subcontract enquiries and technical questions within one working day.