Quality and safety
CH 1+540
Quality is paperwork and ground
In public procurement it is not enough to build it well — you must prove it was built well. Tests, records and photographs are as much part of the job as the stone.
CH 0+060
Quality control
- Records of covered works are signed before a layer is covered — not after.
- Compaction testing of soils and bases to the design requirements.
- Material conformity documents collected from the first delivery.
- An as-built survey at completion.
- Photographic records at every stage, including everything that gets buried.
- Warranty obligations, and we come back during the warranty period.
CH 0+280
Safety
- Safety briefings and personal protective equipment across the crew.
- Traffic management schemes on street and road sites.
- Trench support and slope safety wherever the ground demands it.
- Work in the railway zone under the infrastructure manager's rules.
- Environmental care: soil, fuel and waste handling on site.
CH 0+480
Certification
The company's record includes certification for the construction and repair of railways, bridges, roads, hydraulic structures, industrial buildings, utility networks and cultural heritage objects, worked under an established quality management system and an integrated environmental, occupational safety and social responsibility system.
Copies of current certificates are supplied with our tender, or on request.
Have a site? Send us the drawings.
We answer invitations to tender, subcontract enquiries and technical questions within one working day.
- Address
- Salantų g. 10A, LT-90115 Plungė, Lithuania
- info@plungesjonis.lt
- Office hours
- Mon–Fri 07:00–16:00
- Company code
- 302457787